List of Ongoing Projects
S. No. | Name of work | Nature of work | Client | Value in lakh | State |
1 | Construction & of High Altitude Hill Road From Dembuen To Bruni From KM 0.000 To 36.300 KM In Anini District of The State of Arunchal Pradesh On EPC Mode |
Road works | NHIDCL | 28100 | Arunchal Pradesh |
2 | Construction of 6- Lane access controlled Greenfield highway from km 67+000 to km 99+000 of Rajasthan/Gujarat Border to Santalpur section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Gujarat on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RGBS-Package- 3) | Road works | NHAI | 46200 | Gujarat |
3 | Balance Work of Four Lanning of Gwalior Shivpuri from Existing Ch. 215.000 (Design Chainage 100.757) to Existing Ch. 221.500 (Design Ch. 107.350) Section of NH3 Passing Through Madhav National Park (Total Length 6.593 km) in MP on EPC Mode. | Road works | NHAI | 12500 | Madhya Pradesh |
4 | Development of Six lane access controlled highway of Daat kali Tunnel Dehradun of Ganeshpur Dehradun section of NH72A from km 16.380 to km 19.785 Design Chainage in Uttarakhand under Bharatmala Pariyojana on EPC mode Package3 | Road works | NHAI | 9900 | Uttrakhand |
5 | Construction And Upgradation Of Ditte Dimme-Migging Road (Design Chainage From Km 129.31 To Km 152.81 And Existing Chainage From Km 142.02 To Km 167.1) To 2-Lane With Hard Shoulders Under Project Brahmank In The State Of Arunachal Pradesh On Epc Mode | Road works | BRO | 19599 | Arunchal Pradesh |
6 | Construction of 3-lane new ROB at existing km 373+230 (design chainages 0+440) including widening, construction of VUP at existing km 373+190 (design chainages 0+400) & ramps at LHS & RHS and merging of alignment with PAP flyover at km 372+500 (design chainages 0+710) on Panipat Jalandhar Section of NH-44 (old NH- 01) in the State of Punjab on EPC basis | Road works | NHAI | 20800 | Punjab |
7 | Construction And Upgradation Of Ditte Dimme-Migging Road (Design Chainage From Km 152.81 To Km 173.34 And Existing Chainage From Km 167.10 To Km 189.1) To 2-Lane With Hard Shoulders Under Project Brahmank In The State Of Arunachal Pradesh On Epc Mode Pack-4 | Road works | BRO | 17890 | Arunchal Pradesh |
8 | 4 Laning of Amritsar Bypass GA from New Tarn Taran Road-Ajnala Road from km 0.750-km.43.750 and Upgradation of existing Amritsar-Khemkaran Road to 4-Lane Config from Design km.71.496-km.78.440 Total 49.944 kms PKG-3 in Punjab under BMP on EPC mode | Road works | NHAI | 74100 | Punjab |
9 | Rehabilitation and augmentation of New NH-354 of section Amritsar (airport junction) to Ramdas from Design Chainage km ASR 100.835 to Design Chainage km 139.813 for Length of 38.978 km into Four-Lane under Bharatmala scheme in the State of Punjab (Package-IV) under EPC Mode | Road works | NHAI | 24350 | Punjab |
10 | Construction and Upgradation off Ditte Dimme-Migging Road (Design chainage from Km 104.53 to Km 129.31 and Existing chainage from Km 113.65 to Km 142.0) to 2-Lane with hard shoulders under Project Brahmank in the state of Arunachal Pradesh on EPC mode Pkg-2 | Road works | BRO | 24116 | Arunchal Pradesh |
List of Major Completed Projects :
KRC Infra Project have already developed the projects mention below.
S. No. | Name of work | Type of work | Client | Contract value |
1 | Up-Gradation of Jalgaon Bhadgaon of Nh-753J from Chainage 4+000 km to 56+200 km to two lane configuration in the state of Maharastra on EPC Mode |
Road works | Ashoka Buildcon Ltd | 11100 |
2 |
LOI for carring out design, engineering, procurement and contruction work for four laning of Chuttmalpur – Ganeshpur section of Nh-72A from km 0.00 (km 22.825 of Nh-73) to km 16.00 and Roorkee – Chuttmalpur Gagalheri section of Nh-73 From 0.000 to 33.000 in the State of Uttrakhand |
Road and Structural Works | Gawar Construction Ltd. | 41700 |
3 |
Rehabilitation and Up-gradation to four lanes from km 16.000 to km 96.127 of Gwalior – Jhansi Section of NH-75 in the State of UP and MP on EPC Mode. |
Road and Structural Works | Gawar Construction Ltd. | 21875 |
4.1 | Develop of transport nagar Sec 58, Part III, Faridabad, Haryana | Road work/ Black Carpet | HUDA | 348 |
4.2 | Construction of road in Sec 65, Faridabad, Haryana | Road work/ Black Carpet & Kerbstone | HUDA | |
4.3 | Construction of road in Sec 2, Palwal, Faridabad, Haryana | Road work/ Black Carpet & Kerbstone | HUDA | |
5 | Construction of road in Sec 8,9,10 & 11, Dwarka, Delhi | Earth work/ WMM Black Carpet | K. R. Anand Contractor & Engineers | 450 |
6 | Construction of Toll Plaza on NH-2, Near Palwal, Haryana | WMM/ Black Caret | Maheshwari Brothers Limited | 175 |
7 | Construction of Runway Nagpur Airport | Earth work & Structure work | Vishal Infrastructure Limited | 245 |
8 | Construction of 4/6 Lanes Access Controlled Chittorgarh Bye Pass KM 159.000 of NH-79 to KM 213 Ch. 20.000 KM to 30,000 KM |
Earth work/ WMM/ GSB | Valecha Engineers & Contractor | 800 |
9 | Transportation of Boulder from Dadri to Jewar | Transportation | Jai Prakash Associates Ltd. | 1100 |
10 | Costruction Embakment Yamuna Express way project | Earth work/ WMM/ GSB | Bharamputra Infra Project Ltd. | 1100 |
11 | Widening & Upgradation of Existing 4 lane to 6 lane between Gurgaon to Jaipur Highway | Road work | Gawar Construction Ltd. | 10600 |
12 | Construction of master road Sec – 75 to 89, Faridabad, Haryana | Sector road development | Gawar Construction Ltd. | 22500 |
13 | 2 Laing of Lalpur-Manmao-Changlang from KM 0 to KM 68.30 (NH-52B) in Arunchal Pradesh | Excavation, GSB, WMM on NH-52B | Valecha Engineering Ltd. | 6500 |
14 | Widening & Upgradation of Bharatpur Nagar-Deegh road under RSTDC | Road work | RSRTCL | 5374 |
15 | Construction of road & CD works Zone I at Industrial Area, Ghiloth, Rajasthan | Road work | RIICO | 3448 |
16 | Construction of Fly over Bridge at Subhash Chowk, Gurgaon | Road work | HUDA | 3500 |
17 | Construction of ROB at Hodal, Palwal, Haryana | Construction of ROB at Hodal, Palwal, Haryana | Gawar Construction Ltd. | 2710 |